Separate the project from scheduling

The first conversation identifies the need and confirms whether the project can be handled at your address. Mention an active leak immediately. If planning for a later season, explain your schedule constraints and the known condition of the roof.

Plan for the season

Freezing conditions, snow, rain and temperature can affect access, deck observations and scheduling. A snow-covered roof does not allow the same checks as a clear surface. We discuss the visit’s limitations and realistic next steps. For a winter concern, describe the signs from a safe location.

Review the relevant details

A flat roof may meet walls, sloped sections or mechanical equipment. Mention these features and past repairs. Confirm permit and material requirements with your municipality. The proposal should explain the solution, affected details and conditions still to be verified.

Municipal starting point

Consult municipal information ↗

Always check the relevant authority for your address and the planned work.